How can I learn SAP BPC?

Training for sap bpc in management accounting

  1. BPC420 – SAP Business Planning and Consolidation 11.0 version for SAP BW/4HANA: Administration and Planning.
  2. BPC440 – SAP Business Planning and Consolidation 11.0 version for SAP BW/4HANA: Consolidation.

What is BPC system in SAP?

The SAP Business Planning and Consolidation (SAP BPC) application delivers planning, budgeting, forecasting, and financial consolidation capabilities, so you can easily adjust plans and forecasts, speed up budget and closing cycles, and ensure compliance with financial reporting standards.

What are the two versions available for SAP BPC?

Traditionally SAP BPC came with 2 flavors; SAP BPC for the Microsoft platform and the NetWeaver platform.

Is BPC part of S 4 HANA?

BPC Optimized for S/4HANA, as the name already indicates, runs directly on S/4HANA; SAP’s ERP system as a successor to SAP ECC (Enterprise Resource Planning – ERP Central Component) with an underlying in-memory HANA platform.

How do I create a report in SAP BPC?

Developing Reports Using SAP BPC Web Client Go to New Report and the following screen will open. From the dropdown menu, select a new report, input form. On the right side, you have the list of available dimensions. You can add dimension to Row and Columns as per requirement.

What is the full form of BPC?

Full form or SAP BPC stands for (Business Planning and Consolidation). SAP BPC was developed to help companies to simplify their budget planning.

Is SAP BPC going away?

Another thing to note is that SAP has officially stated the BPC 11.1 version is only supported through 12/31/2024 – but there is a possibility that it may be supported through the end of 2027. The reason for this is because SAP BPC 11.1 is tied to BW/4HANA 2.0, and the maintenance window for that is through 12/31/2024.

What is the future of SAP BPC?

The maintenance of SAP BPC 10.1 for SAP BW 7.5 will continue until the end of 2027 followed by an optional period of extended maintenance lasting until the end of 2030.

What is the latest version of SAP BPC?

SAP BPC 11.0
The official title of the latest version is “SAP BPC 11.0, version for BW/4HANA”, and one key facet for current BPC customers is that this is an entirely new product with a separate license from any past BPC version; therefore, it is more of a ‘migration’ to get to 11.0, not an ‘upgrade’.

What is BPC standard?

The BPC standard is a planning (means also reporting and consolidation) solution based on BW technology mainly designed to be used by LoB. The technical BW objects needed (like InfoObjects, InfoCubes, etc.) are generated and controlled by BPC and not directly exposed in BPC.

What is optimized BPC?

BPC Optimized is in essence BPC Embedded v 10.1 installed on the BW engine present in S/4HANA Finance. BPC Optimized is only available with S/4HANA. Its first purpose is to replace planning functions from FI/CO, which are not there anymore in S/4HANA Finance. Templates specific to BPC Optimized are delivered with it.

What are the main features in BPC optimized for S 4HANA?

The key capabilities of SAP BPC Optimized for SAP S/4HANA Single planning solution are:

  • Real-time access to master and transactional data, for modelling and variance analysis.
  • Flexible drill-down on drivers of profitability including customer, product, geography, and channel.